kharrisblue22 kharrisblue22
  • 11-12-2017
  • Mathematics
contestada

Tyler can shovel the driveway in 2 hours Dakota can complete the job in 90 minutes if they work together how long will it take

Respuesta :

mreijepatmat
mreijepatmat mreijepatmat
  • 11-12-2017
One JOB = 1  and 2 hours = 120 min

Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)

Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90  = 7/360 (Job/minutes)

7/360 of the job was performed in 1 minute
a complete JOB =1 to be performed in x minutes (Rule of three)

x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42

Answer Link

Otras preguntas

How many numbers between 100000 and 999999?
Gardeners at seed stop are planting seeds in 12-row seed trays. They plant 8 seed in each row. How many plants will there be in each tray if all of the seeds ge
What are some of the ways that space shuttles have helped science?
what parts of the kernel remain intact if a carbohydrate is considered a whole grain?
What are the top priorities for current u.s immigration policies?
G(x) = -4x-4 and f(x)=x squared minus 5 and find g(f(x))
15. Which one of the following is true about relationships? A. There are no feelings in a relationship. B. Relationships are always voluntary. C. R
A factor that can change in an experiment is called
What made the homelands unfair for the south afircan blacks?
What is the solution for the inequality shown below W+4>0