A new building needed 14 windows.The builder had already installed 5 of them.If it takes 4 hours to install each window, how long will it take him to install the rest?

Respuesta :

adree22 adree22
  • 12-10-2015
9(remaining windows) X 4(hours to build each one) =36 (hours to build the rest
Answer Link

Otras preguntas

How do I find the all of the angle measures of a kite with only one given angle?
The secular cooling that must someday overtake our planet has already gone far indeed with our neighbour. Its physical condition is still largely a mystery, but
Convert the hexadecimal ieee format floating point number (single-precision) 0x40600000 to decimal:
can a function hit x twice
Membership in the European Union requires countries to have which type of government
is this right? thanks!
A woman who quits smoking tobacco is affecting her health in which way? A. By increasing her likelihood of acting impulsively B. By reducing her risk of
Which of the following words suggests tone? Playful Style Rhyming Systems
Which structures are microscopic blood vessels that are only one cell in thickness?
I need help with this ._.