"​the three legs of a project triangle are _____, scope, and time."

Respuesta :

Kalahira
Kalahira Kalahira
  • 23-10-2017
The project cost is the third leg of the triangle. This is one of the most important parts, simply because this can determine what parts of the project can or cannot be undertaken. Without the proper funding for the project, little can likely be done.
Answer Link

Otras preguntas

Tom bought a soft drink for two dollars and five candy bars. He spent a total of $22. How much did each candy bar class?
Who can call a special session of congress
Brittney's employer matches 25% of her 401(k) contributions up to $1500. Britney's salary is $30,000, and last year she contributed $4000 to her 401(k) plan. Wh
what does You plus Me equal??!
-5=c/7 solve equation
Question 11 (5 points) A family of elements that contains the most reactive metals is the___ noble gases alkaline earth metals alkali metals transition elements
What court declared that Georgia’s laws “can have no force” within the Cherokee territory
Graph the solution to the following system of inequalities in the coordinate plane.
The length of a rectangle is 5 cm less than twice its width. The perimeter of the rectangle is 26 cm. What are the dimensions of the rectangle? Plz help ASAP!
What U.S. government position did both Theodore and franklin Roosevelt hold before becoming president