ANAi3tzenaawe1stor ANAi3tzenaawe1stor
  • 16-01-2017
  • Mathematics
contestada

A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Respuesta :

Аноним Аноним
  • 16-01-2017
7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25
Answer Link

Otras preguntas

Figure 1 and figure 2 are two congruent parallelograms drawn on a coordinate grid as shown below: gure -10-9355321245573 9 10 Figure 2 + Which two transformatio
Explain how changes in technology have affected American culture.
Determine the balanced chemical equation for this reaction.C8H18(g) O2(g)→CO2(g) H2O(g)Enter the coefficients for each compound in order, separated by commas. F
what would N be in this problem 9=8n
A car travels at a constant speed around a circular track whose radius is 3.27 km. The car goes once around the track in 380 s. What is the magnitude of the cen
Why does globalization often increase environmental damage? A. Environmental-protection regulations increase compliance costs and decrease economic competitiven
A truck hauled 208 cubic feet of sand to a construction site the sand is dumped into a cone shaped pile of 10 feet What’s the approximate diameter
Please answer this correctly
As Willard’s business grows and propsers, his company’s total assets requirements will equal ___________. total sources of financing less net assets and owner’s
Mi madre quiere que mis hermanos siempre ____________________ la verdad. a) diga b) digan c) dicen d) dijo