If you want to give a vendor an incentive to complete work early which type of contract would you use?

Respuesta :

kaisersriprad
kaisersriprad kaisersriprad
  • 14-03-2021

Answer:

Time and Materials Contract

Explanation:

A time-and-materials contract may be used only when it is not possible at the time of placing the contract to estimate accurately the extent or duration of the work or to anticipate costs with any reasonable degree of confidence.

Answer Link

Otras preguntas

Was the Articles of Confederation based on the principle of separation of powers? No, because it only created one legislative branch. Yes, because it made three
Is 16.45 greater than, less than or equal to 16.454
What did the colonists claim after the stamp act and tea act? Which colonists made the claim?
Which ancient Egyptian contribution do you think had the greatest impact on later civilizations? Why?
which one is bigger 4.44 or 4.044
what is 0.023 with the 23 repeating as a fraction?
What do most scientists think prevented the rocks in the asteroid belt from forming into a planet
What is the value of the expression (9+15)/3+2?
what is 270 divided by 6
How do you use belief in a sentence