rabindrashrestha320 rabindrashrestha320
  • 13-02-2021
  • Mathematics
contestada

b) Kiran can do 1/8part of a work in 6 days. How much work does he do in
(i) 1 day
(ii) 4 days?​

Respuesta :

angstar4
angstar4 angstar4
  • 13-02-2021
1/8 per 6 days

x per 1 day
1/8 divided by 6/1
1/8 times 1/6
1/48 of the work in 1 day

1/48 times 4 days
4/48 or 1/12 of the work in 4 days
Answer Link

Otras preguntas

What are the major characteristics of grand opera?
Find the domain of this question
The running time for movie A is 33 mins more than twice the running time for movie B. If the running time for movie A is subtracted from triple the running time
Complete the second sentence so that it has similar meaning to the first sentence. Do not change the word given. :)She promised to look into my case personally.
A car has a maximum speed of 341.7 feet/second. Convert this speed to miles/hours.
Relationship between mini and kabuliwala
A function f is depicted in the graph. Find any input values that produce the indicated output. f(x) = -1
what are the seas and oceans that surround zimbabwe
HELP ! Find the Domain in this question
Is the following correspondence a function? Yes or No?