ilovewritingffs ilovewritingffs
  • 12-12-2020
  • Mathematics
contestada

if 3 people can complete a job in 4 days, how many days will it take to complete the job with 5 people?

Respuesta :

briangetalla briangetalla
  • 12-12-2020
2.4 days because 3x4=12/5 =2.4
Answer Link

Otras preguntas

helppppppppppppppppppppppppppppppppppppppp
In your opinion, what was the major reason the U.S had to adopt an “interventionist foreign policy” and enter WWI
write 24/90 in simplest form​
How did the US constitutional address a weakness of the articles of confederation
Given: Angle 1 = Angle 2. If AC:BC = 3:5 and AB = 12, find DB.Please Explain Step by step if possible.A) 1.5B) 4.5C) 7.5 D) 12
Calculate the equilibrium concentration of c2o42− in a 0.20 m solution of oxalic acid.
Several paper clips dangle from the north pole of a magnet. The induced pole in the bottom of the lowermost paper clip is a
How many hydrogen atoms are attached to each carbon participating in a double bond?
what kind of cross is it if two traits are crossed and both traits show up in the offspring?​
How does the system of checks and balances strenghten democracy in the united states?