Answer:

480 hours

Solution,

Time taken by 1 worker to complete the project= 2880 hours

Time taken by 12 workers to complete the project:

[tex] \frac{2880}{12} \\ = 480 \: hours[/tex]

Hope this helps ...

Good luck on your assignment...

Answer Link
Аноним Аноним
  • 15-07-2020

Answer:

480

Explanation:

Answer Link

Otras preguntas

Question 12 (5 points) Which region contains the halogen family of elements
64,-48,36,-27 which formula can be used to describe the sequence
What are the domain and range of the function f(x)= square rootx-7+9?
Kahlil is recording a beat for a song that he is working on. He wants the length of the beat to be more than 10 seconds long. His friend tells him the beat need
Next to the statues and the head, the slab seems unimpressive at first glance. It is roughly the size of a tabletop-three feet nine inches long, two feet four
{(–8, –6), (–5, 2), (–8,1), (7, 3)} fuction?
please answer and thank you!!!
The mass of an electron is 9.11×10−31 kg. If the de Broglie wavelength for an electron in a hydrogen atom is 3.31×10−10 m, how fast is the electron moving relat
Can someone check if this is right
What does x equal? angle2 = (20x - 1), and angle3 = (4x + 13)