cricecrice6100 cricecrice6100
  • 12-02-2020
  • Social Studies
contestada

Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

Why are sexual boundaries important?
f(x)=x^2. What is g(x)?
I WILL AWARD BRAINLIEST!! PLEASE HELP!!! SOLVE EACH!! Find x in each triangle.
74fl oz greater than 8c
Which statement about the use of perspective in Leonardo da Vinci's The Last Supper is true? A. The vanishing point is the point of the greatest implied depth,
Help please! a rectangle has an area represented by t^2-16t+48. Find the expression that represents the length and width of the rectangle.
1. Which was a goal of the victorious allies after World War II? A. Spread of communism B. Total destruction of japan C. Division of Germany into military zon
How much heat is given off when 32g liquid methanol (CH3OH) at its freezing point changes to solid methanol? (Methanol HF=3.16 kJ/mol) A)1.58 kJ B)3.16 kJ C)0.7
What can cause an unconformity between rock layers? A) mixing of strata B) erosion C) continuous deposition D) a change in fossils Please include atleast one s
How does language help characterize the children