jcervantesjc jcervantesjc
  • 13-09-2019
  • Mathematics
contestada

If Jorge has 61 hours of work to do and he can work 7.5 hours a week, how many days will it take for him to finish it all.

Respuesta :

saramomen755
saramomen755 saramomen755
  • 13-09-2019

Answer:57 days

Step-by-step explanation:

Ver imagen saramomen755
Answer Link

Otras preguntas

What is the complement of the angle 178 degrees and 100 degrees
what is a 'light at the end of the tunnel'?
If each of the 8 sides of an octagon is 25 centimeters long, then the perimeter of the octagon is how many meters?
angie has 12 feet if string.She will cut the string into equal lengths of 5 inches each.How much string will be left after she cuts as many of these lengths as
What does blood deliver to every part of the body
Calculate an estimate for the mean temperature
Which of Mendel's laws or principles explains that traits are passed from parents to offspring individually instead of as pairs, groups, or sets?A. The Principl
how do people in Italy use there natural resources
How long will lucy have to wait before her $2500 invested at 6% earns $600 ?
Abc is a triangle, ac=19cm bc=17cm and angle bac=60 degrees. calculate the size of angle abc? answer