a contractor is mixing concrete and mixed 3 parts concrete and 9 parts water. How much water is needed for 12 parts concrete?

Respuesta :

sakie329 sakie329
  • 12-12-2018

Answer:

36 parts water

Step-by-step explanation:

3/9 = 1/3 = for every 1 part concrete, it's 3 parts water.

12/x = 1/3; x = 36

so, 12 x 3 = 36

Answer Link

Otras preguntas

what element of a story is most affected by the characters interactions with their setting
please you dont know how much it would mean to me if u answered it please I'm begging u
Which statement best describes the structure of the passage? Responses It explains how Douglass becomes a free man, referring back to his childhood. It explains
Karen runs 7 miles in 60 minutes. At the same rate, how many miles would she run in 24 minutes?
match the number with the correct label.-1/5 ,0.4 ,-3/4
Dos oraciones utilizando los conectores de relacion copulativa y disyuntiva
[tex]−20x+40=−20x+20[/tex]
COMPLETE ANSWER THE ANSWER TO THE QUESTION IS I'M GOING TO VOTE BRAINLIEST PLSSS ASAPMake own original answerCompose a letter informing an applicant that he/she
why did Hafiz al-assad want to increase the size of syria militraly
Which of the following is equivalent to |x-1| <5?