skullrubble9355 skullrubble9355
  • 12-10-2017
  • Business
contestada

What does "residual risk" mean in the rm process?

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 19-10-2017
RM process stands for risk management process. The RM process includes identifying and controlling risks arising as a result of the operation.
As "residual risk" are denoted the remains of a risk and danger on which a response has been performed.
residual risk=inherent risk - impact of risk controls
Answer Link

Otras preguntas

Which is the best estimate for the capacity of a kitchen sink? Which is the best estimate for the capacity of a kitchen sink? A.2,000 liters B.200 liters C.2 l
Describe two negative ways that the animals living in the area have been affected by the changes shown in the diagram.
What is the equation of the graph below? y=1/2sinx y=1/2cosx y=1/2sin2x
What is the magnitude of -5+ 12i?
You roll a die. Find the probability that you roll an even number or a number less than 5.​
what is 2/5 of 2/3 = ​
What is the worst anime you ever seen
Balloon has a volume of 600-ml at temperature of 360 K. If the temperature of the balloon drops to 250 K, find the volume
Which direction would the graph of y=-|X|+ 9 open? right down left up
1)mention the phase of labour?2)why are uses of medicine prohibited in pregnancy?3)Against which disease PCV vaccine is given? please help...​