Q.1 A small project is composed of 7 activities whose time estimates are listed in the table below: 1-2 1 5-6 3 6 15 4-6 2 3-5 2 5 2-5 1 1-4 2 1-3 1 Optimistic Time (Weeks) Most Likely Time (Weeks) Pessimistic Time (Weeks) 1 7 4 7 2 8 1 1 5 14 8 (a) Draw the project network. (b) Find the expected duration and variance of each activity.

Respuesta :

Otras preguntas

the qustion is what is the greatest common factor of 24,56 and 72
Big bend national park  has about  870 oak trees. Brazos   bend state park has about  565 oak trees. About how many more oak trees does big bend national park h
the qustion is what is the greatest common factor of 24,56 and 72
One similarity in the leadership of Peter the great and Catherine the great was the both
Whatnare some important facts about rebecca cole ? Preferably in bullet form .
The new pencil was 19 centimeters long. How many millimeters long was the pencil?
If 500 students attend Washington Middle School, how many are going to the mountians for vacation? A. 25 B. 60 C. 75 D. 100 E. 125
Two rectangles have an area of 81 square inches. Name one possible perimeter for each rectangle. I need to show the problem please.
How do you graph y=18
What does ¿La Navidad es el 25 de noviembre? mean and how would you reply?