dudecoolsir8051 dudecoolsir8051
  • 12-03-2024
  • Computers and Technology
contestada

A system of independent, preemptable tasks can be feasibly scheduled on one processor if its density is equal to or less than 1.
a. True
b. False

Respuesta :

Otras preguntas

Tim can mow 4 lawns in 6 hours. How many lawns can be mow in 15 hours?
What two numbers multiply to get 120 and add or subtract to get negative 22?
How did Watson and cricks model of DNA incorporate the research of other scientists ?
Find all values of k so that the trinomial x^2+kx-35 can be factored using integers.
What was mercantilism and how did it affect the Anglo American Colonies?
Which statement is true about the thyroid hormones? (1) They increase the rate of metabolism in cells throughout the body. (2)They control how quickly cells use
A major characteristic of the Anasazi culture in what is today the U.S. Southwest was (A) the building of large mounds for burial grounds (B) potlatch ceremonie
Today, Earth’s magnetic field is losing approximately 7 percent of its strength every 100 years. If the strength of Earth’s magnetic field at its surface is 0.5
A cart travels down a ramp at an average speed of 5.00 centimeters/second. What is the speed of the cart in miles/hour?
What was the purpose of the Titanic's inner hull?