Mbach6739 Mbach6739
  • 15-12-2022
  • Business
contestada

The MRP process of determining requirements for lower level items based on the master production schedule is referred to as
a. lot sizing.
b. netting.
c. backward scheduling.
d. exploding.

Respuesta :

Otras preguntas

what is national library week?
By controlling trade, three great kingdoms developed in West Africa. These were the kingdoms of Ghana, Mali, and ______. Fill in the blank.
what does it mean to 'go nuts'?
Divide.(10a^4-5a^3) / 5a
scientists use the Celsius scale as the si unit of temperature. True or False
what does it mean to 'go nuts'?
scientists use the Celsius scale as the si unit of temperature. True or False
In the election of 1860, the _______ won the electoral votes of all the free states, except a fraction of the New Jersey votes
A 9.0 volt battery is connected to four resistors in a parallel circuit. The resistors have 7.0 Ω, 5.0 Ω, 4.0 Ω, and 2.0 Ω respectively. What is the total curre
what does 'all eyes on me' mean?