serggoalie3457 serggoalie3457
  • 13-12-2022
  • Computers and Technology
contestada

If Doug wants a 0.99 probability of completing the project on time, how far ahead of the scheduled meeting date should he begin working on the project? Base your calculation solely on the critical path. Note: Use Appendix B to identify the standard score.
If required, round your answer to one decimal place.

Respuesta :

Otras preguntas

A person's heartbeat is 73 beats per minute. If his heart beats 3.1e9 times in a lifetime, how long does the person live?
What conclusion can be drawn about the historical significance of the Benin plaques
How many degrees is angle b? if the other one is 315
Suppose a triangle has to size of lint 42 and 35 and the angles between these 2 sides is 120 which equated should you solve to find the length of the 3rd side o
How do you think Germans felt in the postwar years?
Which sum or difference identity could be used to prove that cos(pi+q)=-sin q is an identity?
Helllpppp meee fastttt!!!!!! Plzzzzzzz!
help and don't guess
what is a group of organs used for breathing in oxygen and getting rid of carbon dioxide
On Friday, 150 people went to see “ode to algebra” performed in the school auditorium. Both c children and a adults attended the performance. What is an equatio